Crandore Hub

frontier

Stochastic Frontier Analysis

Maximum Likelihood Estimation of Stochastic Frontier Production and Cost Functions. Two specifications are available: the error components specification with time-varying efficiencies (Battese and Coelli, 1992, <doi:10.1007/BF00158774>) and a model specification in which the firm effects are directly influenced by a number of variables (Battese and Coelli, 1995, <doi:10.1007/BF01205442>).

Versions across snapshots

VersionRepositoryFileSize
1.1-8 rolling source/ R- frontier_1.1-8.tar.gz 99.2 KiB
1.1-8 rolling linux/jammy R-4.5 frontier_1.1-8.tar.gz 277.9 KiB
1.1-8 latest source/ R- frontier_1.1-8.tar.gz 99.2 KiB
1.1-8 latest linux/jammy R-4.5 frontier_1.1-8.tar.gz 277.9 KiB
1.1-8 2026-04-23 source/ R- frontier_1.1-8.tar.gz 99.2 KiB
1.1-8 2026-04-09 windows/windows R-4.5 frontier_1.1-8.zip 454.6 KiB
1.1-8 2025-04-20 source/ R- frontier_1.1-8.tar.gz 99.2 KiB

Dependencies (latest)

Depends

Imports

Suggests